Capex costs - sinter plant
The MCI capex cost report includes the following plant: sinter, coke, DRI, blast furnaces, BOF plants, EAFs, induction furnaces, slab casting, billet and bloom casting, heavy plate, hot rolled coil, cold rolled coil, hot dip galvanised sheet, tin plate, organic coated sheet, heavy sections, steel bar, wire rod, drawn wire, welded tube, seamless tube, pellets, washed coal, lime, PCI, air separation, power plant [and more].
If you have an interest in the cost of such plant, in typical installed capacities, in reasons for variation in capex costs for this plant, in who else has purchased similar plant ... then this report is for you.
For further info, please call MCI on +44 775 149 0885.
Back to
Knowledge Base Index