Steel industry forum and free message board.
menu
menu

Terms & conditions of use | Post a reply | Back to steel message board



Re: enq for hms..


Delete this post Submitted by Eleanor Baldo <infinitytraiding@gmail.com> on 17/Aug/2011 in reply to enq for hms. posted by Amit Sharma on 24/Jul/2011
121.54.13.58

Message:

HMS 1 & 2

PRODUCT: HMS 1 & HMS 2
SPECIFICATIONS: 80/20 as conformed to the ISRI CODES 200-206-ISRI 200
MANUFACTURERS: RUSSIA & UKRAINE
QUANTITY: 360,000 MT (Three hundred sixty thousand Metric Tons)
SHIPMENT: 30,000 MT/per Month ( Thirty thousand metric tons per month)
CONTRACT PERIOD: 12 months
PRICE: USD $280 per Metric Ton
PACKAGING: 20 ft or 40 ft wraps / Bulk shipment
PORT OF LOADING: Durban Port, South Africa
DESTINATION PORT: any world safe port
PAYMENT TERMS: 100% LC (letter of credit from first class prime bank)
DELIVERY: CIF
INSPECTION: Quality, Quantity, Weight & photo by buyer at Sellers cost at port of loading for invoicing Quantity assay issued by SGS in clear, All materials are totally free from any types of radiation, bombs, arms, ammunition, and explosive in any form either used or otherwise.

CHEMICAL COMPOSITION INTERNATIONAL STANDARDSC as follows:

Nickel - 0.45
Chromium – 0.20
Molybdenum - 0.10
Manganese – 1.65
The combined residuals other than manganese shall not exceed a total of 0.60 present.

Please confirm if you are willing to close down the contract as to enable us to schedule and arrange for your urgent trip to South Africa for inspection of the materials and signing of contract with us and the representative of the ministry.

LOI (not older thank 1 week) and BCL (showing tonnage & full value) are required to get seller's FCO/contract .
Subject to prior sale & price change without prior notice.



Procedure

1. Buyer issues LOI/ICPO with bank details
2. Seller issues FCO on seller's letter head for buyer to confirm.
3. Seller issues draft contract for acceptance by buyer with amendments if any.
4. Seller confirms the contract in PDF from as final contract.
5. Buyer visit yard for inspection and to view past performance documents.
6. Buyer issues non operative L/C to sellers
7. Seller issues POP from bank to bank and also 2% PGB.
8. Buyer makes the L/C operative.
9. Shipment procedure commences

*******


USED RAILS

PRODUCT: USED RAIL TRACKS
SPECIFICATIONS: R 50 & R 65 as conformed to the ISRI CODES
MANUFACTURERS: RUSSIA & UKRAINE
LENGTH: 15 Meters
QUANTITY: 360,000 MT (Three hundred sixty thousand Metric Tons)
SHIPMENT: 30,000 MT/per Month ( Thirty thousand metric tons per month)
CONTRACT PERIOD: 12 months
PRICE: USD $305 per Metric Ton
PACKAGING: 20 ft or 40 ft wraps / Bulk Shipment
PORT OF LOADING: Durban Port, South Africa
DESTINATION PORT: any world safe port
PAYMENT TERMS: 100% LC (letter of credit from first class prime bank
DELIVERY: CIF
INSPECTION: Quality, Quantity, Weight & photo by buyer at Sellers cost at port of loading for invoicing Quantity assay issued by SGS in clear, clean faxed or emailed version, showing quantity of the goods loaded on board vessel. Hard copies will follow with-in seven (7) banking days. If wrap shipment, add $2/mt

CHEMICAL COMPOSITION INTERNATIONAL STANDARDSC as follows:

R50 – 51.67 kg/m GOST 7173-5
C:0.67 – 0.8%
Mn: 0.75 – 1.05%
Si: 0.13 – 0.28%
P: max. 0.035%
S: max. 0.045%
Ar: max. 0.15%

R65 – 64.72 kg/m GOST 8165-75
C:0.6 – 0.082%
Mn: 0.75 – 1.05%
Si: 0.13 – 0.28%
P: max. 0.035%
S: max. 0.045%
Ar: max. 0.15%


Please confirm if you are willing to close down the contract as to enable us to schedule and arrange for your urgent trip to South Africa for inspection of the materials and signing of contract with us and the representative of the ministry.

LOI (not older thank 1 week) and BCL (showing tonnage & full value) are required to get seller's FCO/contract .
Subject to prior sale & price change without prior notice.


Procedure

1. Buyer issues LOI/ICPO with bank details
2. Seller issues FCO on seller's letter head for buyer to confirm.
3. Seller issues draft contract for acceptance by buyer with amendments if any.
4. Seller confirms the contract in PDF from as final contract.
5. Buyer visit yard for inspection and to view past performance documents.
6. Buyer issues non operative L/C to sellers
7. Seller issues POP from bank to bank and also 2% PGB.
8. Buyer makes the L/C operative.
9. Shipment procedure commences



Replies to this post


 - 

No further replies

Reply to this post






Advertising section