Cost ComponentFactorUnitCost (US$/unit)Fixed (US$/t)Variable (US$/t)Total (US$/t)
Billet1.085t5800.00629.30629.30
Delivery costs1.085t50.005.435.43
Manpower2MHPT2010.0030.0040.00
Energy1.75GJ7.50.0013.1313.13
Electricity110kWh0.070.007.707.70
Consumables1t750.0075.0075.00
Yield loss8.5%–141.250.0012.0112.01
Scrap credit8.5%t3140.00−26.69−26.69
Depreciation & other1t2020.000.0020.00
Packaging1t2.50.002.502.50
SG&A costs1t55.000.005.00
Total cost–––35.00748.37783.37

Swipe the table sideways for more columns; the first column stays in place.

Costs per tonne of seamless tube. Figures as calculated in the model, so rows may not add exactly to the totals because of rounding. Source: Metals Consulting International. A dash (–) means not applicable. Data as of mid-2026.



Seamless Tube and Pipe Cost Modelling Notes and Assumptions

The Steel Costing Model

The cost model shown above illustrates how steel tubemaking costs can be estimated through a simple cost benchmarking approach. The predicted cost shown is not meant to represent an actual cost for any real steel mill. It is a notional figure only – albeit one that is built on fairly representative current input cost and resource usage information.

Input Costs

Key input costs are mid-2026 world average costs, with ferrous scrap at about US$314 per tonne and billet at about US$580/t. SG&A denotes sales, general and administration cost. MHPT denotes man hours per tonne (a measure of labour force productivity). Site visitors are asked to note the high consumables charge shown above – this is mainly accounted for by the very high wear of rolls and guides, usage of which can be very high indeed in a seamless tube mill.

The Steel Product

The product for which the costs are shown is a tonne of carbon steel hot rolled seamless tube ['green pipe'] about 100 mm in diameter and sawn to length; but in need of further finishing (meaning straightening, threading, testing and even stretch-reduction if the final size is to be below 70 mm). The mill type assumed is a CPE-type mill (cross-roll, pierce, elongate) of medium scale (i.e. 100–200 kt/yr pipe capacity).

The Business Environment

Readers are advised that the pipe cost estimates shown should be adjusted to reflect the particular business environment in which the steel plant operates. Thus, electricity charges may be higher during the winter. Depreciation costs may be significantly lower, depending on the mill supplier. Yield performance may also be better than the 8.5% figure shown. The tremendous variety of mill types for seamless tubemaking further indicates that care should be taken in extrapolating from the costs above. Actual pipe mill conversion costs will also be very dependent on final tube diameter as well as on any finishing steps that may be required by the product specification.

For further cost modelling support with seamless tubes, please contact our steel cost economists.

Need costs for your own plant or location? Request a custom cost model →

How to Cite This Page

Metals Consulting International (2026) 'Seamless Tube Cost Model: Pipemaking Production Economics', SteelOnTheNet. Available at: https://www.steelonthenet.com/resources/cost-models/seamless-tube.html (Accessed: 2 November 2026).