Steel Stranded Assets | Blast Furnaces and Coke Ovens

Europe Strands, Japan Retires

A blast furnace reline or a coke battery rebuild commits the owner to coal-based ironmaking for 20 to 40 years. If the works switches to an electric arc furnace before that time is up, the unused years – and the capital behind them – are stranded. We applied one test to every asset in our EU blast furnace tracker and Japan coke oven tracker to see which plants it points to.

13.0 Mt/yr
EU blast furnace capacity relined since 2015 and planned to close with 6–16 years of campaign unused
54 years
Average age of the Japanese coke batteries closed or closing in FY2025–27 – written off, not stranded
410 ovens
Japanese coke ovens built or rebuilt since 2011 at JFE works now retiring blast furnaces

Health warning: these are Metals Consulting International (MCI) assessments on stated assumptions, not company statements.

  • "Stranded" here is an analytical label: an asset whose design life runs past a planned end date. It says nothing about the merits of any company's decision, which may rest on factors we cannot see, such as subsidy terms, product mix or safety.
  • The EU figure depends on company closure plans being met. Where replacement plans slip – as several have – furnaces run longer and less of the reline is stranded.
  • Campaign lengths are conventions: 20 years for blast furnaces and 40 years for coke batteries. Real campaigns vary.
  • The 13.0 million tonnes a year (Mt/yr) excludes voestalpine Donawitz BF 4, whose reline date comes from a database only; including it gives 13.9 Mt/yr.
  • All asset data come from the two trackers and are as of November 2026. Corrections from operators are welcome and will be dated.

The Stranding Test

Each asset is assessed against three questions: when does its current life end, when does demand for it end, and how much capital has been committed in between.

The Stranding Test: Three Outcomes
OutcomeRecent reinvestment?Life outlasts demand?What it means
StrandedYesYes, by a planned closureCapital committed for a campaign that will not be used in full
At riskYesPossibly – demand at the works is falling but no closure is setExposure depends on the next furnace or route decision
Written offNoNo – the asset is at or past the end of its lifeClosure retires an asset that has already earned its keep

Source: MCI methodology. Campaign or design life: 20 years from the last full reline for blast furnaces; 40 years from the latest build or pad-up rebuild for coke batteries.

Key Findings

  • Europe is stranding recent relines. Six EU blast furnaces fully relined since 2015, with 13.0 Mt/yr of capacity, are planned to close with at least six years of their campaign unused. The clearest case is voestalpine's Linz BF 5, relined in 2023 and due to be replaced by an EAF in 2027 – 16 of its 20 years unused.
  • The 2023–2024 relines carry the most exposure. ArcelorMittal Dunkirk BF 3 (relined 2023, planned end 2030), Salzgitter BF A (2024, 2033) and Tata Steel IJmuiden BF 6 (2024, 2035) each leave 9–13 years unused if the replacement plants arrive on time.
  • Japan is retiring its oldest assets first. The coke batteries closed or closing at JFE and Nippon Coke & Engineering in FY2025–27 averaged 54 years old. Yawata's 1965 and 1970 batteries will close with the blast furnace around 2030. These are write-offs, not stranded assets.
  • Japan's exposure sits in its rebuilt batteries. JFE has built or rebuilt 410 coke ovens since 2011 at Kurashiki and Fukuyama – including Fukuyama 6A, a new battery started in August 2026 – while both works are retiring a blast furnace by FY2028. Kurashiki, with four rebuilt batteries and fewer furnaces to feed, is the most exposed site we track.
  • The two trackers point at different plants. No single works appears in both. The common thread is the owners' choice of when to stop reinvesting: European producers relined and then announced EAFs; Japanese producers have so far closed coke capacity at the end of its life.

EU Blast Furnaces Due to Close Before Their Campaign Ends

Every active furnace in the EU tracker whose planned end comes before its last full reline plus 20 years. The headline counts furnaces relined since 2015 with at least five years unused, excluding database-only reline dates.

EU-27 Blast Furnaces Planned to Close Before the End of Their Campaign, November 2026
OwnerPlantFurnaceCapacity (Mt/yr)Last full reline20-year campaign endsPlanned endCampaign unused (years)BasisMCI assessmentGradeSource
voestalpineLinz (Austria)BF 50.8420232043202716Committed closureStranded if plan holdsAvoestalpine
ArcelorMittalDunkirk (France)BF 31.820232043203013Company planStranded if plan holdsAArgus
Salzgitter FlachstahlSalzgitter (Germany)BF A2.020242044203311Company planStranded if plan holdsASalzgitter
Tata Steel NederlandIJmuiden (Netherlands)BF 62.52024204420359Company planStranded if plan holdsATata Steel
voestalpineLeoben-Donawitz (Austria)BF 40.822016203620297Company planStranded if plan holds – reline date database-onlyCGlobal Energy Monitor
SSABLuleå (Sweden)BF 32.62015203520296Company planStranded if plan holdsASSAB
voestalpineLinz (Austria)BF A3.32018203820326Company planStranded if plan holdsAvoestalpine
Salzgitter FlachstahlSalzgitter (Germany)BF B2.22016203620333Company planBelow threshold (under 5 years unused)ASalzgitter

Source: MCI analysis of the EU blast furnace tracker. "Planned end" is a committed closure or a company-stated plan; most plans depend on replacement plants being built on time. Furnaces without a published full-reline date, or whose planned end matches a 20-year campaign, are not shown. Data as of November 2026.

Japanese Coke Capacity at Works Retiring Blast Furnaces

Works in the Japan tracker where a blast furnace is closing or converting, showing the coke batteries built or rebuilt since 2011 and the old batteries closing alongside.

Japanese Coke Batteries at Works Retiring Blast Furnaces, November 2026
OwnerWorksBlast furnace changeBuilt or rebuilt since 2011Rebuilt ovensPublished capacity (Mt/yr)Old batteries closingMCI assessmentSource
JFE SteelKurashikiNo. 2 BF complete suspension FY2028 (replaced by about 2 Mt/yr EAF); No. 3 BF banked1A (2013), 2 A/B (2017), 3 A/B (2016), 6B half (2011)2540.72+Coke 1B closed FY2025; 4 A/B closing FY2027 (1967–1971 batteries)Highest exposure: four rebuilt batteries, fewer furnaces to feedJapan tracker
JFE SteelFukuyamaNo. 4 BF to stop around FY20273 A/B (2019 and 2021), 6A (new, August 2026)1561.14Coke 4 A–C (1971, 175 ovens) suspended FY2025At risk: new capacity sized for the remaining furnaces; exposed to any further BF cutJapan tracker
Nippon SteelYawata (Tobata)BF to stop around September 2030, replaced by an EAFNone0–Coke works (No. 4 1965, No. 5 1970) to close with the BFWritten off: oldest batteries in Japan close at the end of their lifeJapan tracker
Nippon SteelKashimaNo. 3 BF and upstream were scheduled to close at end-FY2024; stop date not published1E (2011), 1F (2016), 2E (2018) retained–0.92+Coke 2 A–D scheduled to close with the BFWritten off: the old batteries were scheduled to close; the new ones serve the remaining furnaceJapan tracker

Source: MCI analysis of the Japan coke oven tracker, which links each battery to its company or trade-press source. Published capacity sums only batteries with a published figure; "+" means some rebuilt batteries have no published capacity. Kashima oven counts for 1E and 2E are not published. FY = Japanese fiscal year (April–March). – = no data. Data as of November 2026.

Written Off, Not Stranded: Japanese Coke Closures

Japanese Coke Batteries Closed or Closing, FY2025–27
OwnerWorksBatteryOvensOriginal start-upClosureAge at closure (years)
JFE SteelKurashikiNo. 1B391967FY202558
JFE SteelFukuyamaNo. 4 A–C1751971FY202554
Nippon Coke & EngineeringKitakyushu1B461974FY202551
Nippon Coke & EngineeringKitakyushu2B541977H1 FY202649
JFE SteelKurashikiNo. 4 A/B861971FY202756
Total and average––400––54

Source: Japan coke oven tracker. Age is the closure year (start of the fiscal period) less the original start-up year. Kashima No. 2 A–D (scheduled to close at end-FY2024) and Mitsubishi Chemical's Kagawa site (150 ovens, scheduled closure H2 FY2027) are excluded because their start years are not published. The footer row gives the total number of ovens and the average age. – = not applicable. Data as of November 2026.

Frequently Asked Questions

What is a stranded asset in steelmaking?

A stranded asset is plant whose remaining economic life runs beyond the date demand for it ends, so that capital already committed to it is never recovered. In steel the classic case is a blast furnace relined, or a coke battery rebuilt, shortly before the works switches to an electric arc furnace or DRI route.

Is every blast furnace or coke oven closure a stranded asset?

No. An asset that closes at or near the end of its design life is written off, not stranded: its capital has been used. Stranding needs recent reinvestment and an early end. The Japanese coke closures in FY2025–27 involve batteries averaging 54 years old, which is a write-off.

Does a blast furnace reline count as new investment?

Yes. A full reline renews the refractory lining and commits the owner to a new campaign, typically about 20 years. If the furnace then closes after a few years, most of that campaign is unused.

Does a DRI and electric smelter route avoid stranding?

Partly. Where DRI is melted in an electric smelter, the liquid iron can still feed the existing BOF shop and casters, so those assets keep working. The blast furnace and its coke supply are still retired, so recent relines and rebuilds on that route can still be stranded.

Methodology

Sources. All asset data come from our EU blast furnace tracker and Japan coke oven tracker, where every row links to its source and carries an evidence grade. This page adds no new asset data; it applies one test to both.

Blast furnaces. Campaign unused = last full reline + 20 years − planned end year. The planned end is a committed closure or a company-stated plan, as recorded in the EU tracker.

Coke batteries. Design life of 40 years from the latest build or pad-up rebuild. A works is "retiring a blast furnace" where the owner has published a closure, suspension or conversion date.

Assessments. "Stranded", "at risk" and "written off" are MCI's analytical judgements on these stated assumptions. They are not statements about the quality of any company's decisions, and they change if company plans change.

For definitions of capacity, utilisation and why coke ovens and blast furnaces cannot simply be switched off, see our steel capacity FAQs.

How to Cite This Page

Kotas, A.M. (2026) 'Steel Stranded Assets: Blast Furnaces and Coke Ovens', SteelOnTheNet. Available at: https://www.steelonthenet.com/resources/capacity/stranded-assets.html (Accessed: 24 November 2026).

Author credentials: ORCID ORCID iD

Related: EU blast furnace tracker, Japan coke oven tracker, steel capacity reports and data, green steel essentials and Japan steel industry profile.