Ukraine produced 21.4 million tonnes (Mt) of crude steel in 2021. Occupation of the Donbas from 2014 and the loss of Mariupol in 2022 removed most of its largest works, and a run of missile strikes in August–October 2026 halted the plants that were left. Our war damage register records each plant and each event, with the owner's own figures where they exist.

19.7 Mt/yr
Crude steel capacity lost to seizure, occupation or destruction, 2014–2022
13.5 Mt/yr
Capacity halted by missile strikes in 2026 – Zaporizhstal, Kametstal and ArcelorMittal Kryvyi Rih
131 kt
Ukraine's crude steel output in September 2026, against an average of 1.8 Mt a month in 2021
Map of Ukraine: steel capacity lost in Donetsk and Luhansk 2014–2022, halted in Dnipropetrovsk and Zaporizhzhia in 2026
Nameplate crude steel capacity lost or halted, by oblast
View full-size image

Lost 2014–2022: Donetsk 14.2 Mt/yr, Luhansk 5.5 Mt/yr. Halted by missile strikes in 2026: Dnipropetrovsk 9.4 Mt/yr, Zaporizhzhia 4.1 Mt/yr. Dnipropetrovsk includes ArcelorMittal Kryvyi Rih (6.0 Mt/yr, in cold shutdown since September 2026) and Kametstal (3.4 Mt/yr). Plant locations are deliberately not shown.

Health Warning: Read These Figures as Nameplate Capacity, Not Lost Output

  • Capacity is nameplate crude steel capacity from public sources. Several plants ran well below it before they were lost or halted.
  • Lost and halted capacity are shown separately and never added together. A halted plant may restart.
  • Plants without a published capacity are listed but add nothing to the totals, so both totals are minimums.
  • Rows marked Unverified are reported in the cited source but not yet independently checked by Metals Consulting International (MCI). War damage is often impossible to confirm on the ground, so some rows may stay unverified.
  • Casualties are shown event by event, exactly as reported by the owner or the authorities. We do not total them.
  • Events are added at least 30 days after they occur. We give city and oblast only, and say nothing about which units are running, repairs or protection.
  • Compiled from public sources as of November 2026. Corrections from owners are welcome and will be dated.

Key Findings

  • Most of the loss came before 2023. Yenakiieve (2017), Alchevsk (2017) and the two Mariupol works, Azovstal and Ilyich (2022), account for 19.7 million tonnes a year (Mt/yr). Azovstal alone had 6.6 Mt/yr of nameplate capacity.
  • The 2026 strikes hit what was left. Between 11 August and 17 October 2026, Zaporizhstal was attacked five times, ArcelorMittal Kryvyi Rih four times, and Kametstal, the Dnipro Metallurgical Plant and an Interpipe plant in Dnipro once each. Owners report damage to blast-furnace, coke, sinter and power facilities – the same ironmaking assets whose age we track for Europe in our EU blast furnace tracker.
  • Ukraine's largest steelmaker is shut. On 25 September 2026 ArcelorMittal said it could not safely restart Kryvyi Rih and put the plant into cold shutdown until the end of the war, with an impairment of about US$1bn. That is a write-off forced by war; for write-offs driven by decarbonisation, see our steel stranded assets analysis.
  • Output has collapsed. Crude steel output fell from 21.4 Mt in 2021 to 7.4 Mt in 2025, and to 131,000 tonnes (131 kt) in September 2026 alone.
  • Some figures still conflict. Where owner statements and press reports differ, both are shown with their sources, and unconfirmed rows are graded C.

Ukrainian Steel Plants Lost or Halted by the War

Click a column heading to re-sort. Grade A = owner statement; B = industry body, trade press, database or major news agency; C = not yet confirmed. Verified = main source checked by MCI.

Ukrainian Steelmaking Plants Affected by the War, November 2026
PlantCompanyCityOblastRouteCapacity (Mt/yr)CategoryStatusSinceGradeVerificationSource
Azovstal Iron & Steel WorksMetinvestMariupolDonetskBF-BOF6.6LostDestroyed in combat; occupiedMay 2022BVerifiedGlobal Energy Monitor
Alchevsk Iron & Steel WorksISDAlchevskLuhanskBF-BOF (open-hearth retired 2008–2010)5.5LostLost control (seized)December 2017BUnverifiedUkrainian Association of Steelmakers
Ilyich Iron & Steel WorksMetinvestMariupolDonetskBF-BOF4.3LostOccupiedApril 2022BUnverifiedGlobal Energy Monitor
Yenakiieve Iron & Steel Works (incl. Makiivka branch)MetinvestYenakiieveDonetskBF-BOF3.3LostLost control (seized)March 2017AVerifiedGlobal Energy Monitor
Donetskstal Metals ComplexDonetskstal (Metinvest 24.9%)DonetskDonetskBF (pig iron only)0.0LostNationalised by breakaway authorities2017BVerifiedGMK Center
Donetsk Metallurgical PlantDonetsk Metallurgical PlantDonetskDonetskNot confirmed–LostNon-operating or uncertain; nationalised by breakaway authorities2017CUnverifiedGlobal Energy Monitor
ArcelorMittal Kryvyi RihArcelorMittalKryvyi RihDnipropetrovskBF-BOF6.0Halted 2026Cold shutdown until end of warSeptember 2026AVerifiedDnipropetrovsk Regional State Administration
ZaporizhstalMetinvest (JV)ZaporizhzhiaZaporizhzhiaBF-OHF4.1Halted 2026HaltedAugust 2026AVerifiedMetinvest (PDF)
KametstalMetinvestKamianskeDnipropetrovskBF-BOF3.4Halted 2026HaltedSeptember 2026AVerifiedMetinvest (PDF)
Interpipe industrial facility, Dnipro – specific unit unconfirmedInterpipeDniproDnipropetrovskNot confirmed–Halted 2026HaltedSeptember 2026BVerifiedGMK Center
Interpipe SteelInterpipeDniproDnipropetrovskEAF1.3OtherStatus unconfirmed after 22 September 2026 strike on an Interpipe plant in DniproSeptember 2026AVerifiedInterpipe (PDF)
Dnipro Metallurgical Plant (DMZ, Petrovsky)DCH SteelDniproDnipropetrovskBF-BOF1.2OtherSteelmaking idle since January 2022; rolling intermittent; halted after September 2026 strikeSeptember 2026BUnverifiedGlobal Energy Monitor
DniprospetsstalDniprospetsstal PJSCZaporizhzhiaZaporizhzhiaEAF + induction furnace1.0OtherOperating at reduced levels2026BVerifiedGlobal Energy Monitor
EnergomashspetsstalEnergomashspetsstal PJSCKramatorskDonetskEAF (castings and forgings)–OtherOperating (company profile)2026BVerifiedRada company directory
Elektrostal KurakhoveElektrostalKurakhoveDonetskEAF (billets)–OtherIdle before the war; liquidation reported 20192019BVerifiedGMK Center

Source: MCI research from owner statements, trade press and Global Energy Monitor. Capacity is nameplate crude steel. "Lost" = seized, occupied or destroyed; "Halted 2026" = stopped by missile strikes in 2026; "Other" = listed for completeness and not counted (operating, idle before the war, or status unconfirmed). – = not published. Data as of November 2026.

War Events at Ukrainian Steel Plants, 2014–2026

Newest first. Killed and injured are as reported for that event by the owner or the authorities; – means not reported. Each event's source grade (A, B or C, as defined under Methodology) is given in the downloadable workbook.

War Events at Ukrainian Steel Plants, 2014–2026
DatePlantEventWhat Was HitKilledInjuredCasualty NoteVerificationSource
17 October 2026ZaporizhstalBallistic missile strike (6 missiles)Internal energy and logistics infrastructure; further damage to blast-furnace facilities00No deaths or injuries in this attack (owner)VerifiedMetinvest
25 September 2026ArcelorMittal Kryvyi RihStatus changeOwner cannot safely restart; cold shutdown until end of war; about US$1bn impairment–––VerifiedArcelorMittal
22 September 2026Interpipe industrial facility, Dnipro – specific unit unconfirmedBallistic missile strikeKey production equipment and infrastructure (night of 21–22 September)474 employees killed, 7 injured (owner)VerifiedGMK Center
21 September 2026ArcelorMittal Kryvyi RihMissile strikeProduction facilities (details not given)––ArcelorMittal's 25 September review of four attacks reported 5 killed and 17 employees injured; the owner did not allocate this total to individual strikesVerifiedArcelorMittal
17 September 2026ZaporizhstalBallistic missile strike (2 missiles)Workshop industrial sites; main and auxiliary process equipment; engineering networks; railway infrastructure01No deaths; 1 employee hospitalisedVerifiedMetinvest
12 September 2026ZaporizhstalBallistic missile strike (4 missiles)Main and auxiliary equipment of blast-furnace and open-hearth shops; power system and networks; logistics044 employees injuredUnverifiedZaporizhstal
12 September 2026ArcelorMittal Kryvyi RihMissile strikeArea of ironmaking complex No. 1222 contractors killed; 2 employees injuredVerifiedArcelorMittal
5 September 2026KametstalBallistic missile strikeSinter production; energy and transport infrastructure544 employees and 1 contractor killed; 4 employees injuredVerifiedSteelOrbis
5 September 2026Dnipro Metallurgical Plant (DMZ, Petrovsky)Missile strikeBlast furnace and coke plant facilities; power and transport; administrative buildings00No casualties: staff in shelters (owner)VerifiedGMK Center
August–September 2026 (date not established)ArcelorMittal Kryvyi RihMissile strikeNot reported––Owner confirms four attacks in five weeks, the latest on 21 September; the date and damage of this attack have not been establishedVerifiedArcelorMittal
27 August 2026ZaporizhstalBallistic missile strikeFive ballistic missiles; blast-furnace equipment, energy and transport infrastructure, open areas00No deaths or injuries (owner)VerifiedMetinvest
16 August 2026ArcelorMittal Kryvyi RihMissile strikeTwo blast furnaces and one power station; energy and blast-furnace operations213Owner, 17 August: 2 killed (1 employee, 1 contractor); 13 employees and contractors injured (no split). Later press reports a third death in hospital.VerifiedArcelorMittal
11 August 2026ZaporizhstalBallistic missile strikeCore and auxiliary production equipment, infrastructure and power system; complete halt828Owner review of 17 September: 8 employees killed, 28 injured. Owner first statement of 11 August: 7 killed, 21 injured. Kyiv Post also reports 8 and 28.VerifiedMetinvest
December 2022ArcelorMittal Kryvyi RihMissile strikeBar and section rolling shop destroyed1–1 employee killedVerifiedInterfax-Ukraine
23 November 2022 (group-wide date)ZaporizhstalSupply interruptionEmergency power-related stoppage during the nationwide attack on energy infrastructure. Metinvest reports a group-wide stoppage; a Zaporizhstal-specific date is not confirmed.–––VerifiedMetinvest (PDF)
20 May 2022Azovstal Iron & Steel WorksDestroyed; occupiedWhole plant––Defenders' casualties not part of this registerVerifiedCBC / Associated Press
12 April 2022Ilyich Iron & Steel WorksOccupiedWhole plant–––VerifiedCEOBS
11 April 2022ArcelorMittal Kryvyi RihStatus changeBlast furnace No. 6 restarted; gradual restart. Date per owner annual report; company history page gives 10 April, Interfax 9 April.–––UnverifiedInterfax
11 April 2022Azovstal Iron & Steel WorksCombat damageOwner reports further damage to Mariupol assets; extent could not be assessed––Not reported for the plantVerifiedMetinvest
Early April 2022ZaporizhstalStatus changeTwo of four blast furnaces began blowing in; sinter plant partly restarted–––VerifiedMetinvest (PDF)
3 March 2022ArcelorMittal Kryvyi RihStatus changeOwner announced decision to idle steelmaking and begin idling all blast furnaces (expected to take 7–10 days); mining continued at reduced output–––UnverifiedInterfax
2 March 2022ZaporizhstalStatus changeSome equipment placed into hot conservation; available iron and steel processed and steel-product output suspended (owner statement also names Zaporizhkoks)–––UnverifiedMetinvest
24 February 2022Interpipe SteelStatus changeComplete production suspension across Interpipe (group-wide)–––VerifiedInterpipe (PDF)
24 February 2022Azovstal Iron & Steel WorksStatus changeProduction put into suspension (hot conservation) for staff safety–––VerifiedMetinvest
24 February 2022Ilyich Iron & Steel WorksStatus changeProduction put into suspension (hot conservation) for staff safety–––VerifiedMetinvest
2021Donetsk Metallurgical PlantStatus changeProduction restarted (year as given by GEM)–––VerifiedGlobal Energy Monitor
19 December 2017Alchevsk Iron & Steel WorksLost controlPlant, Alchevsk Coke and Ecoenergy–––VerifiedInterfax-Ukraine
2017Donetskstal Metals ComplexNationalisedWhole plant–––VerifiedGMK Center
15 March 2017Yenakiieve Iron & Steel WorksLost controlWhole plant and Makiivka branch seized; Khartsyzk Pipe, Yenakiieve Coke and other assets lost the same day–––VerifiedMetinvest
2015Donetsk Metallurgical PlantStatus changeProduction paused, blockade-related (year as given by GEM)–––VerifiedGlobal Energy Monitor
August 2015Alchevsk Iron & Steel WorksStatus changePlant reactivated–––VerifiedYugMK
2015Donetsk Metallurgical PlantStatus changeProduction restarted (year as given by GEM)–––VerifiedGlobal Energy Monitor
16 March 2015Yenakiieve Iron & Steel WorksStatus changeProduction restored at low levels–––VerifiedMetinvest (PDF)
7 February 2015Yenakiieve Iron & Steel WorksShelling damage; production suspendedGas pipeline, a production facility and an electrical substation damaged; rail supply disrupted; plant and Makiivka branch suspended 7 February–16 March 2015––Not reportedVerifiedMetinvest
January 2015Azovstal / Ilyich – attribution disputedSupply interruptionIndustrial water supply to a Mariupol steelworks temporarily interrupted after shelling damaged power to pumping stations. Metinvest AR2014 names Azovstal; the SEC disclosure names Ilyich. One event, plant unresolved.–––UnverifiedMetinvest
October 2014Yenakiieve Iron & Steel WorksStatus changeProduction resumed after almost two months–––VerifiedMetinvest
August–September 2014 (date not specified)Ilyich Iron & Steel WorksShelling damageMinor property damage to sinter plant from artillery fire––Not reportedVerifiedMetinvest
August 2014Alchevsk Iron & Steel WorksStatus changeProduction stopped after shelling of the city––Not reportedVerifiedYugMK
Mid-August 2014Yenakiieve Iron & Steel WorksShelling damage; production suspendedPower lines supplying Yenakiieve damaged; several production shops damaged by shell fire (owner statement dated 18 August 2014)––Not reportedVerifiedMetinvest (PDF)
2014Donetsk Metallurgical PlantStatus changeProduction paused (year as given by GEM)–––VerifiedGlobal Energy Monitor

Source: MCI research; each row links to its main source. Damage descriptions summarise the owner's wording. Casualty figures are not totalled because owner running totals and strike-by-strike figures do not always agree. – = not reported. Data as of November 2026.

Ukraine Crude Steel Output, 2013–2025

Ukraine Crude Steel Output, 2013–2025
YearCrude Steel (Mt)
201332.8
201427.2
201523.0
201624.2
201721.3
201821.1
201920.8
202020.6
202121.4
20226.3
20236.2
20247.6
20257.4

Source: World Steel Association. 2026 monthly figures (Ukrmetallurgprom) are in the workbook. Data as of November 2026.

Download the full register, including other assets (coke, coal, pipe), national figures and every source, as an Excel workbook (xlsx).

Methodology

Scope. Steelmaking plants in Ukraine (blast furnace, basic oxygen, open-hearth and electric arc) affected by war since 2014. Coke, coal, iron ore, ferroalloy and pipe assets are listed in the workbook and are not counted in steel capacity. Battery-level coke data for another market is in our Japan coke oven tracker.

Events. Shelling and missile damage; supply interruptions caused by attacks (power, water, gas, rail); seizure, nationalisation, occupation or destruction; and status changes announced by the owner, such as suspension, hot conservation, restart or shutdown.

Capacity. Nameplate crude steel capacity, with the source named. Capacity lost and capacity halted are kept separate. Plants without a published figure are counted as zero.

Casualties. As reported by the owner or Ukrainian authorities, separating employees and contractors where the source does. Defenders and civilians outside the plants are not part of this register.

Evidence. Each plant and event carries a source grade: A for owner statements, including those in regulatory filings; B for industry bodies, trade press, databases and major news agencies; C where a date or detail is not yet confirmed. Separately, Verified means MCI has opened the main source and confirmed the figure or wording cited; Unverified means it is reported in that source but not yet independently checked. Russian Ministry of Defence claims are not used.

How to Cite This Page

Metals Consulting International (2026) 'Ukraine Steel Plant War Damage Register', SteelOnTheNet. Available at: https://www.steelonthenet.com/resources/capacity/ukraine-steel-plants-war-damage.html (Accessed: 29 November 2026).

Related: our EU blast furnace tracker, Japan coke oven tracker, steel stranded assets, crude steel capacity by country and our plant capacity database.

Need Independent Analysis of Ukrainian Steel Assets?

152 projects in 48 countries since 2001

Free, confidential first conversation No obligation Reply within one working day