Capital Investments Data
2012 Analysis: Investment in 2012 showed continuing strength across emerging markets with China leading in both upstream and downstream projects. India maintained focus on raw materials beneficiation and coke production. Russia invested heavily in finishing facilities including cold rolling and coating lines. Service centres and steel processing facilities featured prominently, reflecting growing demand for value-added products. Major integrated plant announcements included Vietnam's Tata Steel joint venture.
| Country | Company | Location | Project | Description |
|---|---|---|---|---|
| Belarus | Byelorussian Steel Works | BMZ Steel Works | HSM | Uncertain as at mid-2012 if BMZ has found a foreign investor to implement this project |
| Brazil | Siderúrgica Três Lagoas | Três Lagoas Site | Light Long | Project of Brazilian steelmaker Votorantim (who will supply billet). 2nd phase will be an extra 250 kt rebar |
| Brazil | ArcelorMittal | Monlevade | Blast Furnace | This is ArcelorMittal Monlevade's second blast furnace in Minas Gerais state |
| China | Baosteel Group | Zhanjiang | Integrated Steel Plant | Zhanjiang project in Guangdong Province |
| China | Anshan | Putian | CRM/HDG | 700 kt CRC plus 300 kt HDG |
| China | Rizhao Steel | Mazhou | Welded Tube | Jinghua welded pipe project – 7 production lines – production of high frequency welded tube |
| Colombia | Votorantim / Acesco jv | Not Specified | Integrated Steel Plant | Integrated flat product steelworks – uncertainty whether to use imported or local ore |
| Egypt | Ezz Steel | Suez Free Zone | Continuous Casting – Billet | Simultaneous construction of new DRI plant envisaged also |
| Germany | Tata Steel | Gelsenkirchen | Steel Processing | Second slitting line to process coil in thicknesses of 0.4–4.0 mm and in widths up to 1,650 mm |
| Germany | ThyssenKrupp | ThyssenKrupp Nirosta | Steel Processing | Skin pass mill for stainless cold rolling facility |
| India | Tata Steel | Jamshedpur | Air Separation Unit | Linde is the supplier |
| India | JSW Steel | Bengal Project Site | Integrated Steel Plant | Bengal project is simultaneous with a 2 Mt/yr expansion in Vijayanagar |
| India | SAIL | Rourkela and Burnpur | Coke Ovens | 0.77 Mt at Rourkela and 0.88 Mt at Burnpur |
| Iran | Government of Iran | Savadkooh | Coal Washing Plant | Construction schedule to follow that of adjacent coke plant |
| Iran | Government of Iran | Savadkooh | Coke Ovens | 30-month construction schedule starting mid-2009 |
| Iran | Mobarakeh Steel Company | Mobarakeh Steel | Power Plant | MAPNA contract for two power plants each 500 MW |
| Japan | Kobe Steel | Kobe Works | Desulphurisation | New desiliconisation and desulphurisation equipment |
| Kazakhstan | ArcelorMittal | Temirtau | Air Separation Unit | Supply and installation will be by Germany's Linde Group |
| Kazakhstan | Evraz Holdings / Caspian jv | Evraz Caspian Stal | Light Long | Light section mill investment |
| Kazakhstan | ArcelorMittal | Temirtau Works | Blast Furnace | Refers to commissioning of blast furnace #2 |
| Korea | Dongkuk Steel | Incheon Works | Light Long | Output planned of high-tensile rebar (SD800) and vibration-resistant rebar (KS D3688) to 57 mm diameter |
| Malaysia | Masteel | Bukit Raja Works | Light Long | The new facility will be adjacent to the Bukit Raja billet plant |
| Mexico | Nippon Steel / Ternium jv | Not Specified | Coating | State-of-the-art JV for high-quality galvanised and galvannealed steel sheets |
| Romania | ArcelorMittal | Hunedoara | Light Long | New rebar mill. Expansion of site capacity from approximately 385 kt to 700 kt |
| Russia | Severstal | Cherepovets | Air Separation Unit | 2,000 tonnes per day of gaseous oxygen |
| Russia | Magnitogorsk I&S Works | Magnitogorsk | Cold Rolling | Cold rolling and galvanising complex |
| Russia | NLMK | Novolipetsk | Desulphurisation | Two-station desulphurisation unit with total capacity of 5.8 Mt/yr |
| Saudi Arabia | Al Rajhi Steel Industries | Al Rajhi Steel | Light Long | Capacity expansion from 0.8 Mt to 1.8 Mt rebar |
| Saudi Arabia | Global Pipe Company | Not Specified | Welded Tube | 200 kt longitudinal submerged arc welded pipe to 60" diameter, for use in oil and gas projects |
| Turkey | İzmir Demir Çelik | İzmir | Light Long | Medium section mill to diversify product range |
| Turkey | Kardemir I&S | Kardemir Works | Continuous Casting – Billet | Continuous steel billet and bloom plant; contract with SMS Group |
| Turkey | Kardemir I&S | Kardemir Works | Power Plant | Contract with China Shanghai Corp for Foreign Economic & Technology Cooperation (SFECO) |
| Ukraine | Industrial Union Donbass | Dzerzhinski Iron & Steel | Ladle Furnace | Installation of ladle furnace #2. Commissioning scheduled end-2011 or early 2012 |
| United Kingdom | Van Dalen | Sheffield | Scrap Preparation | Ferrous and non-ferrous shredder facility for Sheffield location |
| United Kingdom | Tata Steel | Lackenby | SSC | Construction focus – sales of Teesside beams, Scunthorpe sections, Corby tubes |
| USA | Lee Steel | West Michigan | Steel Processing | Expansion downstream from slitting – with new laser multi-blanking line |
| USA | ArcelorMittal | Steelton Works | Reheat Furnace | New walking-beam reheat furnace with advanced energy & environmental technology |
| USA | Gerdau Ameristeel | Calvert City, KY | Reheat Furnace | Natural gas powered billet reheat furnace for rod mill |
| Venezuela | Siderúrgica Nacional | Ciudad Piar | Steelmaking/HSM | New State-owned EAF mill will make slab and HRC. Andrade Gutierrez is building the plant |
| Vietnam | Tata Steel / VSC / Vicem jv | Vung Ang, Ha Tinh | Integrated Steel Plant | To be established in 3 phases over a 10-year period |
| Vietnam | POSCO | Hong Bang | Cold Rolling | Location is industrial complex near Ho Chi Minh City |
Source: MCI research. Data as of 2012.
See also: analysis of plant and equipment suppliers
Metals Consulting International (MCI) maintains a database of over 1,300 steel industry modernisation projects. This database contains individual modernisation records identifying the country, investor, facility, capacity impact, capital cost, capex cost per tonne, commissioning date etc. Please email info@steelonthenet.com