ArchiveSteel Capex Projects 2021. This page records steel industry projects scheduled for commissioning in 2021, kept as a historical record. Compiled June 2022. Figures are as published and are not revised, so they reflect conditions at that time. For the latest figures, see Steel Capex Projects 2026.
2021 Steel Sector Capital Investments
CountryInvestorFacilityEquipmentCapacity (kt)Capex (US$m)
AustriavoestalpineKapfenbergSpecialty EAF205392
CameroonPrometalDoualaBar & rod mill300–
ChinaBaowuAnhuiScrap processing2,80068
FranceArcelorMittalGalsa 2HDG800104
FranceCelsaBayonneBar mill60066
GhanaB5 PlusPrampramEAF / CC / Bar25080
IndiaKIOCL / RINL JVVisakhapatnamPellet plant2,000129
IndiaRINLRae Bareli unitRailway wheels36227
IndonesiaKrakatau SteelBantenHot strip mill4,000521
ItalyAcciaierie Bertoli SafauUdine WorksRod mill500230
MexicoTerniumPesqueria WorksHSM3,6281,100
PakistanCentury SteelCentury SteelBar mill50079
RussiaEvrazZapsibEAF / thin slab / HRC2,500490
RussiaLinde GroupUral SteelAir separation unit635 t/d O₂57.5
RussiaMechelBeloretsk PlantWire drawing plant503
RussiaTenaris / Severstal JVSurgutWelded tube – OCTG300240
TurkeyErdemir GroupİskenderunVacuum degassing1,20080
TurkeyYildis Demir ÇelikKocaeliHDG35080
UKBritish SteelScunthorpe MillBenzole plant–13.84
UKSiddall & HiltonBrighouseWelded wire mesh–2.8
USSteel DynamicsSintonEAF / thin slab / HRC3,0001,900
USNova Tube & SteelDelta, OhioWelded tube–70
USNucorNucor Steel ArkansasHDG453.5240
USZekelman IndustriesBlythevilleWelded tube–150
UzbekistanUzbek Metallurgical PlantBekabadEAF / thin slab / HRC1,000–

Source: MCI research. – = no data. Data as of June 2022.

ArcelorMittal Galsa 2 galvanising line in Florange was launched in 2019, but not actually commissioned until 2021.
Initial Krakatau HSM capacity is 1.5 Mt/yr but with ramp up to 4 Mt/yr over time.
Tenaris / Severstal OCTG joint venture abandoned in April 2022, due to Russian invasion of Ukraine.



All investment and modernisation projects above are scheduled for commissioning in 2021. Capacity data is in thousand tonnes (kt).

Metals Consulting International (MCI) compiles a database of investment projects in the international steel industry. This database contains individual modernisation records identifying the country, investor, facility, capacity impact, capital cost, capex cost per tonne, commissioning date etc. Please email info@steelonthenet.com or call +44 775 149 0885 for further information.






business restructuring

BUSINESS RESTRUCTURING

Thinking about corporate restructuring? Are you perhaps on the road to privatisation? We have a lot of experience in metal business turnaround and would be pleased to assist you. Contact us for a no-obligation discussion.

Our Restructuring Service →