ArchiveSteel Capex Projects 2024. This page records steel industry projects scheduled for commissioning in 2024, kept as a historical record. Compiled January 2025. Figures are as published and are not revised, so they reflect conditions at that time. For the latest figures, see Steel Capex Projects 2026.
2024 Steel Sector Capital Investments
CountryInvestorFacilityEquipmentCapacity (kt)Capex (US$m)
AlgeriaTosyalı HoldingsOran WorksDRI/EAF / CC / HRC2,0001,500
ArgentinaTenarisCIC SteelworksEAF861.65100
BrazilSimecPinda plantMini-mill expansion500300
CanadaAlgomaSault Sainte MarieEAF3,356557
CanadaA-M DofascoHamiltonDRI2,5001,434
ChinaFujian Baotai StainlessFuzhouCRM – stainless1,100775
ColombiaTenarisTuboCaribeInduction heater22<1
EgyptAir LiquideAin SokhnaAir separation unit77080
FinlandKuusakoski OyVeitsiluotoScrap processing plant15027
FranceArcelorMittalFos-sur-Mer340 t twin LF–80
FranceArcelorMittalMardyckElectrical steel200330
GermanyArcelorMittalDuisburgLadle furnace–13
GermanyArcelorMittalEisenhuttenstadtElectrolyser2 MW6
GermanyMax AicherStahlwerk AnnahutteReheat furnace (WBF)24022
GermanySalzgitterFlachstahl WorksBlast furnace reline2,000117
GermanySalzgitterFlachstahl WorksShredder–32.7
GermanyTata SteelFeijen SSCDecoiling line–22
IndiaFero Alloys CorporationFACOR WorksSubmerged arc furnace30087.52
IndiaJSLJajpur and HisarSolar power4228
IndiaKIOCL LimitedMangaloreCoke ovens180111
IndiaNMDCNagarnagarPellet plant2,00027
IndiaTata SteelPunjab locationEAF / CC / Bar750327
IndiaTinplate Co of IndiaJamshedpurTinplate line300243
IndiaTitagarh Rail / RamkrishnaNot disclosedRailway wheels200134
NetherlandsVan MerksteijnEemshavenRod mill580337
PeruAceros ArequipaPiscoBar mill30075
PhilippinesReal Steel CorpPampangaSolar power16.818
PolandArcelorMittalKrakow WorksBatch annealing–13
PolandCognorSiemianowiceLight section mill450100
RomaniaBeltrameBeltrameEAF / CC / Bar600354
RomaniaBeltrameBeltrameSolar power110 MW105
RussiaMetalloinvestMikhailovsky GOKDRI2,080539
TurkeyÇelik HalatKartepeWire rope12.43.3
TurkeyCinar BoruCinar ÇelikPickling line [flat]30022
TurkeyErdemir GroupCemisgezekSolar power310189
TurkeyFilyos Demir ÇelikCaycumaEAF / CC / Stainless1,000–
TurkeyHabaşAliagaBar mill1,50063
TurkeyHascelikOsmaneliEAF / CC / Stainless slab250212
TurkeyİçdaşCannakaleHSM5,000998
Turkeyİzmir Demir ÇelikAliagaSolar power2.06 MW2
TurkeyKaptan Demir ÇelikMarmara EreğlisiSolar power74.3
TurkeyNoksel Çelik BoruOsmaniyeERW welded tube20025
TurkeyNoksel Çelik BoruOsmaniyeSolar power326
TurkeyOyakErdemir MadencilikPellet plant3,000550
TurkeyTezcan GalvanizDikiliSolar power5032
TurkeyTosyalı Demir Çelikİskenderun WorksRod mill90053
TurkeyTosyalı ToyoOsmaniyeCRM – tandem650185
TurkeyTosyalı-ToyoTosyalı-ToyoTinplate line(s)325200
TurkeyTufan MetalurjiAdanaEAF / CC24418
TurkeyYesilyurt Demir ÇelikSamsunSolar power10034
USHighbarOsceolaMicro-mill544550
USNucorCrawfordsvilleGI & PPGI plants270290
USNucorKingmanEAF melt shop544100
USNucorLexingtonMicro-mill390.01350
USTerniumShreveportOrganic coating line12098
USUS SteelBig River SteelHDG295280
UzbekistanUMPBekabadEAF / thin slab / HRC1,000770
VietnamHoa Phat GroupHoa Phat Dung Quat 2BOF / CC5,6003,670

Source: MCI research. – = no data. Data as of January 2025.

CIC in Argentina (Tenaris investment) denotes Campana Industrial Center.
ArcelorMittal Dofasco envisage later investment in a 2.4 Mt EAF plant in Hamilton.
New Mardyck plant in France will be for production of electrical steels for EV electric motors in particular.
India's KIOCL was formerly known as the Kudremukh Iron Ore Company Limited.
Oyak pellet plant investment will increase Erdemir Group self-sufficiency to about 80–85%.



All investment and modernisation projects above are scheduled for commissioning in year 2024. Capacity data is in thousand tonnes (kt).

Metals Consulting International (MCI) maintains a database of 1,345 steel industry modernisation projects. This database contains individual modernisation records identifying the country, investor, facility, capacity impact, capital cost, capex cost per tonne, commissioning date and so on. Email info@steelonthenet.com or call +44 775 149 0885 for further information.






performance improvement

STEEL PLANT OPERATIONS

Looking to improve your plant's operating performance? We have technical experts in melting casting and rolling, who are able to diagnose problems and offer recommendations. See our case studies page.

Read Our Performance Case Study →